ethercat-linux/docs
Tony Cao f0163d8d70 800B PDO variant + long-term stability evidence + analysis docs
- twin_layout_blob_sized generalized: multi-entry TwinCAT line format
  (1 real @240bit + N continuation + remainder entry); 1024B path kept
  byte-identical; 800B = 27 entries verified on hardware
- 800B constants (PAYLOAD/SM 800), deployed as el6695_rt_800b
- 10-min + 5h stability runs: 18M cycles, zero errors, zero mismatches,
  PLC nMismatch frozen over the whole run (monitor_5h.csv evidence)
- docs: 800B plan/design/verification/test-report chapters,
  jitter analysis (NFS rootfs stall primary cause), D2000 dev plan
- scripts: 800B deploy/relink/verify, mismatch-delta, 5h monitor
2026-08-06 01:10:50 +08:00
..
1kb-verification-progress.md EL6695 8-byte bidirectional exchange with per-byte verification 2026-07-27 19:01:05 +08:00
8b-bridge-design.md 800B PDO variant + long-term stability evidence + analysis docs 2026-08-06 01:10:50 +08:00
8b-test-report.md 800B PDO variant + long-term stability evidence + analysis docs 2026-08-06 01:10:50 +08:00
8b-verification-methodology.md 800B PDO variant + long-term stability evidence + analysis docs 2026-08-06 01:10:50 +08:00
500us-latency-plan.md 2kHz spin-lock mode: RTT halved to 2ms, per-byte XOR proof at 500us cycle 2026-07-28 00:11:34 +08:00
800b-pdo-plan.md 800B PDO variant + long-term stability evidence + analysis docs 2026-08-06 01:10:50 +08:00
d2000-dev-plan.md 800B PDO variant + long-term stability evidence + analysis docs 2026-08-06 01:10:50 +08:00
jitter-analysis.md 800B PDO variant + long-term stability evidence + analysis docs 2026-08-06 01:10:50 +08:00
scope-waveform-design.md J1900 <-> TwinCAT 1 kHz verification over EL6695 bridge 2026-07-22 08:55:41 +08:00
verification-progress.md EL6695 secondary side: SAFEOP/OP bring-up + 1kHz data loop 2026-07-23 00:46:48 +08:00